Thursday 19 November 2009

Small loft conversion

This is what the loft was like on the monday morning when i started
After clearing away the old tank and stuff got the floor laid and some framing started

The completed loft after 5 days work ready to be plastered


View of the otherside of the completed loft with access hatch on right hand wall for storage space.




Double garage door replacement

These are the old damaged doors that were to get replaced
Wood being marked out and cut in the workshop

The two doors just finished waiting to be primed



The completed doors primed and fitted into the old opening



Saturday 17 October 2009

GARDEN DECK

Setting out the deck and getting levels set
Frame of deck set out with step

Deck boards laid


Completed deck with handrail and spindles




Thursday 3 September 2009

Replacing damaged window putty

Window with damaged leaking putty
Step 1 chip out old putty and any flaking paint

Step 2 apply a bead of putty around the frame against the glass then with
a putty knife run it around the edge against the glass at an angle then
smooth of with your finger .
job done.

Casement window repair

The window frame after replacing rotten timbers
Side frame was badly rotten in 2 places so the timber was removed

Close up of the damaged timbers removed



Window renovations

Casement windows with all new putty glazing beads and flaking paint removed
Casement window partly renovated and one on the left not started yet


Solid oak flooring

This is the start of a solid oak floor i have been fitting approx 50 sq metres
Another pic of the floor going down


Oak double doors

2 louis oak half glazed doors paired up to form double door set
2 louis oak cupboard doors

View of both sets of double doors with solid oak standards and facings



Friday 14 August 2009

Oak computer desk

This desk was designed to suit the customer as they had trouble getting their legs below a normal height desk and couldnt get one to fit in the space they had available

Garage door conversion

The existing up and over garage door was removed and the opening framed out to allow for a normal door to be fitted and the rest clad with pine.

Selection of fitted oak doors

Worcester oak door
Dordogne oak door with matching oak facings and skirtings

Dordogne oak glazed with matching oak facings and skirting



Garage facelift

The original timbers were all rotten at the front of the garage but the rest were ok so i made new doors and re-clad the other parts .

Wednesday 12 August 2009

Replacement timber casement windows

Solid oak kitchen

Sink area awaiting marble top and dishwasher
Fridge freezer fitted into units and space left for oven

Tall wall unite fitted to conceal gas boiler


Cooking area










Monday 10 August 2009

Badly rotted joists and flooring

Rotten timbers
Floor after all the rotten joists had been removed.

New joists being laid over a damp proof membraine


The completed floor with 18mm chipboard covered with 6mm ply and sealed




Flat roof converted to pitched roof

New timbers being fitted to form new pitched roof
New roof completed with 18mm ply covered with 1 layer of underfelt then 1 layer of torch on green mineral felt

Front view of roof showing pitch of new roof wrapped in pvc facia to match existing facia



Small Porch

Small porch designed to fit around existing back door

Fitted Sliding Wardrobes

View of inside of wardrobes fitted out with shelving and hanging rails
Centre shelving

Finished wardrobes with beach effect slidding doors