Saturday 16 October 2010

Sunroom

Location for new sun room
Foundations dug ready for concrete

Block work started

Getting blocks up to window level

Window level

Timber kit going up


Block work finished to roof height with doors and windows fitted


Roof timbers going in to suit polycarbonate sheeting



Roof on and wind and water tight with floor laid

Completed outside except for rough casting


Completed room with furniture


Other side of completed room with corner sofa
Job done.

New doormer windows and front

Original frontage
Internal window old

New window fitted x2


New frontage and windows done in upvc



Monoblock patio

Lifting of old slabs and leveling of ground
Pavers layed with just the cuts to do

Completed patio



Small landing handrail

Old stair landing
New landing handrail with spindles and turned newel post


Garden fence

Setting out the fence
Trellis work at front

Main part finished



New porch side

old damaged and rotten porch
New side with new door


External re-clad

Existing rotten building

New re done with red pine cladding

L shape raised garden deck

Deck under construction

Completed deck


Alcove doors

Old doors

New handmade to suit pine doors

4 doors in total



Small deck

small deck with handrails

Meter cupboard alcove

The existing alcove full of cables
Shelving out

Completed with 2 panel doors to hide cables and electrical equipment



Small utility room

Half finished utility room

Other view


New kitchen

Old kitchen being removed

New kitchen fitted

View of hob and oven

Other side of kitchen




Greenhouse staging

The customer required staging to be made to suit his greenhouse

Replacement garade doors

Old doors badly rotten at bottom

New doors with the left hand door as a non opener