Friday 14 August 2009

Oak computer desk

This desk was designed to suit the customer as they had trouble getting their legs below a normal height desk and couldnt get one to fit in the space they had available

Garage door conversion

The existing up and over garage door was removed and the opening framed out to allow for a normal door to be fitted and the rest clad with pine.

Selection of fitted oak doors

Worcester oak door
Dordogne oak door with matching oak facings and skirtings

Dordogne oak glazed with matching oak facings and skirting



Garage facelift

The original timbers were all rotten at the front of the garage but the rest were ok so i made new doors and re-clad the other parts .

Wednesday 12 August 2009

Replacement timber casement windows

Solid oak kitchen

Sink area awaiting marble top and dishwasher
Fridge freezer fitted into units and space left for oven

Tall wall unite fitted to conceal gas boiler


Cooking area










Monday 10 August 2009

Badly rotted joists and flooring

Rotten timbers
Floor after all the rotten joists had been removed.

New joists being laid over a damp proof membraine


The completed floor with 18mm chipboard covered with 6mm ply and sealed




Flat roof converted to pitched roof

New timbers being fitted to form new pitched roof
New roof completed with 18mm ply covered with 1 layer of underfelt then 1 layer of torch on green mineral felt

Front view of roof showing pitch of new roof wrapped in pvc facia to match existing facia



Small Porch

Small porch designed to fit around existing back door

Fitted Sliding Wardrobes

View of inside of wardrobes fitted out with shelving and hanging rails
Centre shelving

Finished wardrobes with beach effect slidding doors



Fitted Bathroom

Chrome towel rail


New completed shower cubicle

Shower cubicle



New toilet and baisin supplied and fitted in new bathroom