Wednesday, 3 March 2010

Window alcove replacement

Existing window alcoves after damage from a burst pipe.

Rebuilding the frames and sheeting out.

One completed with new 8 inch facings and existing shutters re-used.


The pair of windows completed ready for painting.



Kitchen 12 hour revamp

old kitchen side A
Old kitchen side B

Side A new oak doors with new worktops and
pelmet.

Side B with new worktops ,doors and pelmet.
Job done




Basic walnut kitchen

Kitchen ripped out ready for new units
Kitchen partialy fitted with new appliances

Cooker with a very thin glass touch control hob


Completed



Integrated fridge freezer unit and frosted glass wall units





Wednesday, 27 January 2010

Timber garage doors

These double doors were made to suit the existing opening.

oak floor

Rustic oak laminate with oak decorative skirting and facings.

Replacement aluminium windows with mock sash

The old windows
Room with a view

Completed windows tilt and turn made of wood supplied finished in white.



Loft conversion no 2

This was what i started with .
New loft access was cut to allow for new stair.

Loft partialy sheeted with gyproc.


Basic new stair fitted into cupboard.




Completed loft waiting to be plastered.