Saturday, 16 October 2010

Greenhouse staging

The customer required staging to be made to suit his greenhouse

Replacement garade doors

Old doors badly rotten at bottom

New doors with the left hand door as a non opener


Thursday, 8 April 2010

Fusion stair system

Old wooden stair
New system partially finished

Top landing with new newel post


Completed stair




Completed stair




Tuesday, 23 March 2010

Solid oak cottage style door

Internal view
External view of door


Kitchen 12hour revamp update

Completed kitchen with tiled splash back and walls painted.

Finished



Wednesday, 3 March 2010

Rotten floor

This is what i found after lifting a floor board as the floor was bouncy.
The floor had to go plus the joist ends next.

New joists resting on a new wall plate with a new damp proof barrier.


New joists bolted alongside existing joists that have had any rott removed and sprayed with preservative.




New floor completed .




Under stair storage

Shelving for shoes
This was a lost space until i cut a hole under the stair and found a large space suitable for storage
so i framed it up and fitted a 4 panel grained door and shelved it out.